Case

Installation Report: Insertion Type OMF Series Electromagnetic Flowmeter

2025-01-02

Model: OMF Series Insertion Type Electromagnetic Flowmeter
Installation Method: Hot Tap Installation

 

1. Installation Overview

An OMF Series Insertion Type Electromagnetic Flowmeter was installed in an underground wastewater pipeline. Due to limited space and the need for a low-cost solution, the client requested a flowmeter that would be easy to install without disrupting the flow or requiring modifications to the pipeline.

We recommended the insertion type electromagnetic flowmeter because it requires no cutting of the pipe or additional flanges. The hot tap installation method was used, which allows for the installation of the flowmeter without needing to stop the flow of the pipeline.

 

2. Installation Process

 

  • Hot Tap Method: A small hole was made in the pipeline, and the flowmeter was inserted without interrupting the flow of wastewater. This method avoids the need to cut the pipe or install flanges.

 

  • Flowmeter Insertion: The flowmeter was installed through the hot tap fitting and securely positioned in the pipeline by a thread base welded onto the pipeline.

 

  • System Testing: After installation, the system was tested to confirm that the flowmeter was accurately measuring flow.

 

3. Client Satisfaction

The installation was completed quickly and efficiently. The client is satisfied with the performance of the OMF Series Insertion Type Electromagnetic Flowmeter, appreciating the ease of installation and cost savings.

 

Conclusion:
The OMF Series Insertion Type Electromagnetic Flowmeter was successfully installed using the hot tap method, offering a cost-effective solution with no disruption to pipeline operations. The client is happy with the performance and installation process.


mde

Leave a Message

Please contact us for free quotation by form below. We promise the quickest response within 24 hours:

Home Tel Mail Inquiry